The tallest tower in Western Europe is anchored into the ground with enormous concrete feet punching their way downwards through London Bridge Station and into an existing maze of brick-vaulted basements.
Solution
Early in the project we were tasked by the main contractors MACE to waterproof two of these vaulted areas to provide dry accommodation for a vital plant room. We were able to deliver this in a fast-moving programme using a Newton cavity drain membrane system.