Menu Close

REGAL WHARF, LONDON

Diagnosis
This major development included a full basement, part residential, part carpark is built directly against the adjacent canal which provides a constant water pressure to the depth of our waterproofing system.

Solution
We installed a full cavity drain waterproofing system to the residential area requiring a Grade 3 environment to BS8102:2009. The car park floor slab was prepared before applying a full Newton 706-HB epoxy resin vapour barrier system to the car park floor.

Enquiries

To book a survey or if you have a question which needs our helpĀ please complete the following form orĀ call 01491 577 560.